text.skipToContent text.skipToNavigation

TIAP BASE

TIA Portal SIMATIC S7 basic course

Course type

Siemens TIA Portal
 

Introduction

Introductory course TIA Portal with S7-1500 / 1200 and TP 700.
 

Target group

Installers, maintenance staff, programmers, service and maintenance, employees working with S71200 / 1500/300/400 / ET200
 

Foreknowledge

Some previous knowledge in electrical engineering.
 

Goal

After the training, you can create simple S7 programs with TIA Portal and program modifications, as well as:
 

Content

  • Overview of S7 PLC and HMI panels
  • Operation of the S7 PLC
  • Addressing the PLC
  • Software TIA Portal, STEP7 and with WinCC
  • Construction of a TIA Portal project
  • Opening a project with STEP7 and with WinCC
  • Create a new project with STEP7
  • Online functions of STEP7 and WinCC
    • Loading a PLC and HMI project
    • Testing and monitoring the PLC and HMI
    • Comparison of a project online and offline
  • Program with PLC basic commands
  • Document and save program
  • Practical tasks.
 

Duration

2 days

Why not take a look at these trainings we offer:

Check out our other success stories:

  • TESTIMONIAL
    4 mrt. 2021
    Moderna Printing – in tune with the times
    Along the E313, in the Belgian town of Paal Beringen, the Moderna Printing building stands out day and night. And rightly so, because inside, a three-shift team takes care of a gigantic amount of printed matter 24 hours a day, five days a week. The possibilities are very diverse, from advertising brochures and glossy magazines to sleekly designed travel brochures. Moderna Printing recently invested in an expansion. By building a new hall and with new state-of-the-art machinery the company focuses on an improved fulfilment of their customers’ wishes. The lighting, of course, could not be neglected. itsme Breemes was engaged to offer some customised lighting advice.
    Read more
  • TESTIMONIAL
    4 mrt. 2021
    Sustainable from top to bottom
    On the outskirts of Hengelo-Zuid tons of waste are given a new purpose each year. Through incineration, separation and composting, energy and raw materials are extracted and find their way back to society. With the heat that is released during incineration, Twence generates enough power to provide half of all households in the Twente \(region in the Eastern Netherlands\) with electricity. In order to guarantee the continuity of all the plants, operators carry out regular inspection rounds in the installations, so good visibility is important. In switching from fluorescent lighting to LED, Twence enlisted the help of itsme.
    Read more
  • TESTIMONIAL
    1 mrt. 2021
    Shining in customisation
    Every machine leaving the factory in Dokkum, Friesland \(the Netherlands\) is the result of a specific customer request. The team at De Jager RVS translates such ideas into final designs that fit in perfectly with practice. Their specialisation? Building customised machines in which stainless steel plays the leading role. This was the case when a large dairy producer asked them for a vertical transport solution. The choice of a pneumatic actuator was an easy one. In order to get everything that was connected with this critical application right in one go, they invited itsme and Festo to the design table. “You want to integrate a bit of security for yourself.”
    Read more
  • TESTIMONIAL
    8 feb. 2021
    Clear communication is half the battle
    eReM provided complete electrical installation for new shipyard in Kenya Sometimes a project seems to have been arranged from front to back. But what if you are asked at the very last minute to show what your company is capable of? At eReM in Zwijndrecht, the Netherlands, they know all about it. In part thanks to a rock-solid offer they convinced their end customer – an internationally operating Dutch shipbuilder – to come on board with them. And in this case literally because, as it concerned the installation of the entire electrical system of a new shipyard in Kenya, the components were shipped by sea freight. Their main challenge? In the preliminary phase everything had to be 100% correct. This required thorough preparation in which eReM could count on support from itsme.
    Read more

Stay up to date with the latest news:

You are probably also interested in these product groups:

Explore our competences, services and solutions for your success: