text.skipToContent text.skipToNavigation


Well prepared?



You may think:

"If my frequency drive fails, I'll order a new one right away". 

But is a one-to-one replacement still available? At what point do you want to have this information? When production stops, or perhaps a little earlier? You may not realise it, but a Danfoss AC drive often lasts more than 10 years.
 

Danfoss has developed a life cycle model that consists of four phases:
1.    New
2.    Active
3.    Limited
4.    Inactive
Each phase is characterised by its various possibilities. These include extending the warranty, availability of spare parts, the possibility of providing service, the availability of a retrofit solution or the purchase of a new drive. 

 




We would be happy to carry out an “itsme-Factory-Scan” with you. 

During an on-site audit we will, together with you, map out the most important Danfoss frequency drives that are in use at the production location. We look at the general condition of the drive, including wear and tear, age, exposure to risks and the urgency factor in the event of a breakdown. After the audit, we analyse the items according to the Danfoss life cycle model. For each frequencydrive, we identify the stage of the life cycle and the future possibilities in relation to the continuity of production. We provide a report with key facts that can support management in making decisions about managing future risks. Our advice and recommendations enable you to plan maintenance, retrofits, future upgrades and replacement for profitable on-site production. 

By filling in the form below this page, we can contact you to make an appointment. 
 





Of course, you can also do the inventory yourself. 

Send us the list of AC drives you have in use and we will enrich this data with the relevant life cycle choices. We will be happy to discuss the status of your existing AC drives and our advice and recommendations with you. We will then draw up an action plan for future availability planning. 

Yes, I will carry out the inventory myself. Download the inventory form via the button.
Download the inventory form here and send it filled in to ia@support.itsme.eu.

 

Yes, I would like to know what this means for my site

 
 

Stay up to date with the latest news:

  • NEWS
    25 apr. 2025
    Festo - Save energy, increase productivity
    Because pneumatics has a high power density, pneumatic components are widely used in machine lines. Smaller components are gaining popularity due to ease of use, energy savings and productivity gains.
    Read more
  • NEWS
    24 apr. 2025
    Siemens - Scalable and Flexible Safety Concepts
    Siemens offers a digital workflow that helps with every step of safe machine design. Through an integrated tool chain-from risk assessment and safety evaluation to hardware selection, engineering and validation-the process is streamlined and documentation efforts are minimised.
    Read more
  • NEWS
    16 apr. 2025
    Schneider Electric - Modicon Edge I/O NTS
    Modicon Edge I/O NTS, Schneider Electric’s latest IP20 distributed I/O system, is more than just an input/output system. It is designed to equip machine builders, system integrators, and industrial end-users with the tools they need to thrive in an increasingly data-driven digital world. The system's ability to aggregate and securely share data enables smarter decision-making and improved operational performance. With open Ethernet protocols for connectivity with a wide variety of devices and architectures, OPC UA technology for secure communication and interoperability, and built-in hardware cybersecurity, Modicon Edge I/O NTS helps ensure connectivity, performance, availability, and enhanced network security. Furthermore, the system complies with current cybersecurity regulations, enabling end-users to safely access and fully leverage their data — boosting industrial efficiency, flexibility, sustainability, and profitability.
    Read more
  • NEWS
    14 apr. 2025
    Niedax - MTC
    The Niedax MTC is a strong and stable click-on wire mesh tray available in various designs and shapes. Thanks to its unique integrated coupling system, the different sections can be quickly and easily clicked together.
    Read more

Check out our other success stories:

  • TESTIMONIAL
    2 apr. 2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more
  • TESTIMONIAL
    19 feb. 2025
    Peeters - Young Company, New Equipment
    Since its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
    Read more
  • TESTIMONIAL
    26 dec. 2024
    Kusters - Putting weight behind it
    Kusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
    Read more
  • TESTIMONIAL
    22 nov. 2024
    Eneco - Green light for green electricity and steam
    Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
    Read more

Why not take a look at these trainings we offer: