Components of an automation system are normally used for a very long time during their life cycle.
It is therefore questionable whether the component is still available in the event of failure. It is therefore important to manage the life cycle proactively. Timely information about the availability of spare parts, for example, is one of the most important planning criteria here.
Siemens identifies six phases in the product life cycle:
1. Beginning of delivery
2. Availability period and active support
3. Announcement of product phase-out
4. Product cancellation 1. Available only as spare part
5. Product cancellation 2. The spare parts are no longer available
6. End of the product life cycle

itsme FactoryScan
We would be pleased to carry out an itsme FactoryScan at your location to determine the status of each Siemens component. To do this, we use a unique Siemens tool that can be easily connected to the PLC. This tool scans the network and creates an overview of all the installed network components. This inventory is enriched by itsme with relevant data concerning current status, availability, future availability, replacement items etc. You decide how extensive you want to receive the report by choosing from the modules: Basic and Extended.
Click on the button for an example report
Module "Basic"
The Basic module shows the general product lifecycle status. The focus here is on analysing functional obsolescence.
The Basic report includes:
- Obsolete overview of Siemens and other products. The number of critical components. Furthermore a list of unknown and third party products
- Number of parts available for delivery as original part, successor part or other type
- Information on repair possibilities
- Measures and recommendations on usability and availability of spare parts
Module "Extended"
This module contains the Basic Module ánd provides information on Mean Time Between Failures (MTBF).
The Extended report includes
- Availability and risk analyses based on the MTBF
- Determination of the MTBF value already reached
- Detailed MTBF report per component that highlights components with an MTBF value greater than 80 per cent
We can carry out the "itsme-Factory-scan" together with you. Based on the resulting overview, we would like to discuss the current status of the existing components. We can then discuss a scenario for future availability planning.
Yes, I would like to know what the itsme factory scan could mean for my site

You might also be interested in this:
Check out our other success stories:
-
TR Service - Future-proof low-voltage panelRead moreTR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
-
Peeters - Young Company, New EquipmentRead moreSince its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
-
Kusters - Putting weight behind itRead moreKusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
-
Eneco - Green light for green electricity and steamRead moreEneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
Why not take a look at these trainings we offer:
-
PROFINET CPNERead moreavailable in Dutch
-
PROFIBUS CPERead moreavailable in Dutch
-
WinCC-SCADA2Read moreavailable in Dutch
-
PCS7-SAFE V9Read moreavailable in Dutch